Production scheduling your floor can actually follow.
Production scheduling decides which order starts when, so the plant ships on time with as little work waiting as possible. We schedule one point in the line and let everything else follow its pace.
The scheduling board, live
A day on the board: orders released at the pacemaker’s pace, buffers tracked in green, amber and red.
| Order | Product | Due | Buffer used | Status | Action |
|---|
Pacemaker load
0.0 h planned of 8.0 h
Hours released this shift
Release queue 0
Waiting for the pacemaker’s pace
- On track, under 33%
- Watch, 33–66%
- Act today, over 66%
- Latepast due
What the board runs
Release
Start only what can finish. Each order is checked for a complete kit before it is released.
Buffers
See trouble before it’s late. When an order’s protective time runs out it turns red, and someone owns it today.
Inventory
Stock where work waits, and nowhere else. Minimum and maximum levels, replenished from what is actually used.
Your part numbers, routings and plans stay in your setup. We set it up with your team in the Sprint and coach until your team runs it.
Questions
How long does it take?
A one-week Diagnostic first, then a six-week Sprint in which the schedule goes live on the value stream. We coach until it runs without us.
What does it cost?
One week, fixed fee from $35,000 for one value stream (one product family’s flow, from order to shipment), credited to the Sprint. More value streams or sites are quoted to size. You don’t pay if it doesn’t deliver where to pace the line and a go or no-go. The Sprint is quoted from what the Diagnostic shows.
Will it work with our ERP?
Yes. It runs alongside your ERP, and nothing in the ERP changes. The board is set up from the report exports of the system you already have.
Can we run it in Excel?
Yes. A spreadsheet works when it does less: schedule one pacing point, release work from a buffer, and show which orders need help today. Production scheduling in Excel
Is this drum-buffer-rope?
Yes. The pacemaker is the drum: its schedule sets the pace for the whole line. A buffer of time protects it, read green, amber or red every morning, and the rope releases work at its pace. Drum-buffer-rope explained
Finite or infinite capacity?
Infinite plans pile load past what a step can run; finite plans for every machine are often out of date by mid-morning. We schedule one point to its real capacity and protect the rest with buffers. Finite vs infinite capacity scheduling
Start with one value stream.
A one-week Diagnostic: where to pace the line and a go or no-go, or you don’t pay.