Line efficiency up 40%, and a site that adopted lean everywhere
A large consumer-goods manufacturer with high-speed packaging lines, after more output from the lines it already had.
The numbers
Where it started
Time on the packaging lines went to stops, changeovers and jams, and there was no single picture of which losses cost the most.
What we did
Measured the losses on three production lines and ranked them by the time and material they cost.
Used the Five Focusing Steps on the step that limits the line: get the most from it, and set the rest of the line to its pace.
Ran the improvement work with the plant’s own team on the floor.
Showed the results to site leadership, which then adopted lean manufacturing across the site.
Why it held. The waste analysis convinced the site to adopt lean manufacturing everywhere, so the work did not stop at three lines.
Start with one value stream.
A one-week Diagnostic: where to pace the line and a go or no-go, or you don’t pay.